• Skip to main content
  • Skip to primary sidebar
  • Skip to footer
  • Home
  • Departments ▼
    • FEATURED
    • IOP VACATIONS
    • REALTOR DIRECTORY
    • Entertainment & Leisure
    • Food
    • Health & Fitness
    • History
    • House & Home ▼
      • Home Services
    • People
    • Places
    • Politics
    • Real Estate ▼
      • Real Estate Articles
      • Isle of Palm’s Real Estate Experts
      • Wild Dunes Real Estate
      • Top Ten Homes Sold
    • Video
  • Special ▼
    • ISLAND REAL ESTATE
    • Isle of Palms Restaurants & Dining
    • Everything Wild Dunes
  • Local Podcasts ▼
    • Isle of Palms Podcast
    • Special Isle of Palms Real Estate Podcast
    • Carolina Real Estate Podcast
    • Mount Pleasant Podcast
    • Charleston Women Podcast
    • Charleston Wedding Podcast
    • Hammock Coast Podcast
  • Read ▼
    • Island Vibes
    • More Local Magazines ▼
      • Mount Pleasant Magazine
      • Charleston Women
      • MP Senior Living
      • Mt Pleasant Pets
  • Subscribe
  • Advertise ▼
    • Spreading Isle of Palms Positive Vibes
Island Vibes logo

Island Vibes

The pride of Isle of Palms yesterday, today and always.

Ad: Read Island Vibes online!

Phase II of Waterway Boulevard progressing: Project anticipated to significantly check island flooding

Posted by IOP Mag Leave a Comment

While Tropical Storm Arthur recently brought a temporary respite of cooler weather to the Southeast, its heavy rain provided an early reminder of the flooding and other tidal intrusions that South Carolina coastal communities face during each hurricane season.

On Isle of Palms, between 21st Avenue and 41st Avenue, work is underway on Phase 2 of the Waterway Boulevard Flood Barrier Project to not only combat the next round of coastal flooding but hopefully prove a long-term solution to the forces of Mother Nature.

Flooding road, IOP, South Carolina, 29451, rain“The project includes raising the pathway to an elevation of 7 feet to provide protection from extreme tides and long-term sea level rise,” said Hillary Aton, project manager with Thomas & Hutton engineering services in Mount Pleasant, the company in charge of the flood project. “For context, portions of the existing pathway were below 5 feet elevation, and in some areas, as low as 4.27 feet, where overtopping has occurred repeatedly during extreme tide events.”

Phases 1 and 1a were completed in fall 2025, which consisted of a new $1.5 million flood barrier within the Harbor Golf Course at Wild Dunes. Holes 9 and 10 that parallel the Intracoastal Waterway were raised in elevation to assist in seasonal tidal flooding.

Aton pointed out, however, that Phase II includes the installation of new, localized drainage systems to capture and convey stormwater runoff along Waterway Boulevard beneath the pathway and installation of “in-line check valves on all outfall pipes discharging to the Intracoastal Waterway.”

“These check valves are designed to prevent tidal backflow into the drainage system, reduce ‘sunny day’ flooding and preserve system capacity during storm events,” she said. “No changes, additions or expansions to the scope of work have been made.”

This portion of the project runs for approximately 1.68 miles and is scheduled for completion in fall 2026.

Funding for the project was approved in August 2024 for approximately $1.08 million. The federal cost share amounted to $979,931.70; the remaining cost of $108,881.30 either must come from IOP City or another funding source secured by the city.

“Localized flood reduction projects support risk reduction for the impacts from tropical systems and other flooding events,” said Tiffanie Barrett, chief of public information and external affairs with the South Carolina Emergency Management Division. “So they are an important tool for improving the resilience of coastal communities – as well as other communities.”

No one is sure yet how these improvements will stand up to future king tides or coastal storms because “the tidal protection components have not yet been tested by a major coastal storm or severe tidal event,” Aton said. She added though that early drainage improvements are already delivering benefits – an encouraging sign to safeguard the island from “increasing coastal flood risks in the years ahead.”

“Together, Phases 1 and 2 of the Pathway and Flood Protection Project represent a critical investment in the city’s long-term resilience,” Aton said. “The full completion of Phase 2 is expected to establish a continuous tidal barrier, reduce tidal intrusion from the Intracoastal Waterway and significantly mitigate coastal-driven flooding impacts.”

By L. C. Leach III

Related

Logo for law practice, Thorn Run Partners, who represent the City of Isle of Palms in US Federal Courts.City hires lobbying firm to fight for island issues at federal level Historic territory, Shell Ring, of the South Carolina, SC Native American, Sewee, tribe.A Lowcountry Thanksgiving: Sewee – First Native American tribe to lay claim to IOP An image showcasing a waterfront home on Isle of Palms, South Carolina before that was added before the city's new pool-building regulations.Beachfront owners must comply with new pool-building regulations

Filed Under: Environment, Island Vibes Story, News

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

Search This Site

Follow us and Help Spread Positive Vibes

Connect with us on Facebook
Connect with us on Instagram
 

Online Magazine

Younger You - Lasers, toxin treatments, facial, weight loss and much more.
Ad: Carolina Real Estate Podcast. Click and go watch & listen to valuable real estate podcasts that may help you save on your next real estate transaction!
Ad: The Isle of Palms Podcast. Listen. Watch. Learn.
Pleasant Family Dentistry in Mount Pleasant, SC. Experience the BEST, and find out why we've been awarded 7 times in the BEST of MOUNT PLEASANT!
Ad: Check out dream home 34 Waterway Island Drive in Wild Dunes.

Recent

  • Day in the Life of a Lifeguard: The sentries keeping you safe
  • Isle of Palms Summer Fun Guide 2026
  • New crosswalks to increase safety for pedestrians along Palm Boulevard
  • IOP leaders approve largest budget in island history – tax increase likely: Major expenses include drainage, boulevard improvements, beach renourishment
  • Phase II of Waterway Boulevard progressing: Project anticipated to significantly check island flooding

Footer Widget Header

Mount Pleasant Magazine - family of sites logo
North Mount Pleasant Magazine - family of sites logo
Sullivan's Island Magazine - family of sites logo

Footer

BE PREPARED!

Disaster Preparedness Plan [PDF]

Hungry in IOP?

Check out Isle of Palms Restaurants
Everything Wild Dunes

Copyright © 2026 Isle of Palms Magazine. All Rights Reserved.